Timber Peak, the timber tower in Mainz, completed — first tenant moves in
German proof that UBM's strategy is not just a declaration. The first timber-hybrid high-rise in Rhineland-Palatinate was completed on schedule, with a global medtech player as its first tenant.
UBM Development has completed Timber Peak on schedule — the first timber-hybrid high-rise in Germany's Rhineland-Palatinate. Located in the Zollhafen district of Mainz, the building has 12 storeys and rises to nearly 40 metres. It is tangible proof that the company's commitment to timber is not a marketing slogan but a model it is actually delivering — the same one UBM is also developing in Poland.
Countable sustainability
Timber Peak's greatest asset is what can actually be weighed. Its structure uses 1,050 cubic metres of timber, allowing the building to store roughly 1,000 tonnes of carbon dioxide long-term — rather than emitting it, as a traditional reinforced-concrete structure would. At a time when tenants and funds are accounting for their carbon footprint, this stops being an aesthetic argument and becomes a hard number in negotiations.
First tenant: Dexcom for a decade
The building has also started earning in earnest. Its first tenant is Dexcom, a global medtech player, which has signed a ten-year lease for around 2,000 square metres of office space — roughly 23% of the total. A long, ten-year lease with a credible international tenant is the best possible start to commercialisation: it stabilises income and lends credibility to the building in the eyes of other prospective tenants.

For us at Method Press, Timber Peak shows that in this new cycle, the winner is whoever can turn a structural decision into a countable promise — tonnes of CO₂, years of lease, metres — and present it to tenants in a way they understand. Without that layer of communication, even the best building remains just a well-executed structure.
Editorial material by Method Press based on UBM Development statements and press reports (Reuters/Sahm Capital, MarketScreener, OTS — 16 June 2026 and 16 September 2025). Technical data (12 storeys, ~40 m, 1,050 m³ of timber, ~1,000 t of CO₂) and the Dexcom lease terms are as stated by the company and may change.

